Overcoming Housing Shortages: Nudura's solution to affordable high-quality homes

Abbie Bradshaw / 03 April 2025

Providing high quality homes that don’t compromise on the energy efficiency and comfort to address the affordable housing shortages is a challenge in which local authorities and developers have to rise to.

Working with Tremco CPG UK, could be the perfect solution that local authorities and developers within the United Kingdom are looking for.

The likes of Nudura ICF provide a quicker build time, superior energy efficiency qualities and a cost-effective solution to tackle the target in order to reach the affordable housing quote set by the UK Government.

NHBC Fast Track Compliance

With the recent NHBC Accepts accreditation, Nudura now has the benefit of being pre-approved form for compliance with the National House Building Council. This approval comes with a multitude of benefits including the faster approval times which equal faster project starts. With the time saved, developers can save valuable time and resources by avoiding multiple compliance checks. Explore more here: 5 Reasons Developers Should Adopt NHBC-Approved ICF in Their Next Project | Nudura)

Build Time

As the UK faces a shortage of affordable housing, it is important to that local authorities and developments provide solutions through the likes of affordable housing schemes. Time is of the essence to provide these solutions which is where Nudura, the NHBC accepted, industry leading ICF brand can be of advantage to meet tight deadlines.

The traditional built house takes 30 weeks on average to build from substructure to completion whereas a Nudura ICF house can be completed in only 19 weeks. This condensed timeline is achieved through simplicity of wall installation using Expanded Polystyrene (EPS).

Nudura Solid Insulated Wall Structures lock together, with patented Duralock technology, to build walls far quicker than timber frame or traditional brick. When the system is interlocked and in-filled with concrete, it creates a solid monolithic, permanently insulated wall, which also give low air permeability. The simplicity of the system means that construction is quick and does not require skilled labour, such as bricklayers.

While the substructure and fit-out time remain the same, for a standard dwelling, a Nudura structure can be built in approximately 10 to 14 days – including the first floor. Based on these figures, 1.7 standard homes can be built in the same 52-week time frame compared to 2.7 Nudura ICF homes. Thus, doubling the amount of affordable homes that can be built with Nudura ICF to meet the UK Government’s 20,000 a year target.

Cost Efficiency

Keeping costs low is crucial for all building projects, but it is especially vital for social housing developments with tight budgets. Partnering with Tremco CPG UK provides a cost effective solution for both developers and future residents.

With an extensive network of skilled tradespeople, Tremco CPG UK can efficiently train operatives to construct with Nudura, apply Dryvit render systems, and install airtightness solutions using a range of Illbruck products. This reduces the need for specialist trades, helping to keep project costs under control.

Our team also collaborates with you to minimise potential delays that could drive up budgets and impact profitability. As construction material costs continue to rise, Tremco CPG UK delivers a competitively priced alternative for affordable housing.

Nudura ICF technology offers a high quality, energy efficient, and cost effective solution to the UK’s affordable housing crisis. With NHBC Accepts accreditation, compliance can be streamlined to create faster build times which can help developments get off the ground quicker. By reducing approval delays, minimising specialist labour requirements, and keeping material costs under control, Nudura ICF enables developers to meet housing targets efficiently while ensuring durability and sustainability.

Contact the Nudura team to find out more here